New Workshop for Fruit & Vegetable Packing Machines
A larger workshop lets two packing-machine lines run side by side, cutting standard lead times to about three weeks.
Last month we moved assembly of our bag tying machines and vegetable bunching
machines into a larger workshop. The extra floor space means two lines can run
side by side, and every machine now gets a full test run before it ships.
That change cut standard lead times to roughly three weeks, and we can take
bigger multi-line orders without pushing delivery dates. The checking routine is
the same as always: each machine is tested against a printed checklist before it
leaves.